Inventory of turbine control parts

Knowledge base

Articles & Insights

Technical guidance, maintenance tips, and industry perspectives from the Didrikson Associates team.

July 2026
Understanding GE Speedtronic Mark VI Control Cards

A practical overview of the Mark VI control architecture, common card types, and what to look for when sourcing replacements.

June 2026
Flame Sensor Selection for Gas Turbines

How UV scanners and flame rods differ, and why matching the sensor to the combustor environment matters for reliability.

May 2026
When to Repair vs. Replace a Control Card

Cost, lead time, and warranty considerations that help operators decide between remanufactured and factory-new cards.

April 2026
24-Month Warranty: What’s Covered

A breakdown of our reconditioned-card warranty, test documentation, and the return process.

March 2026
Sourcing Obsolete Turbine Parts

How we use surplus, OEM, and aftermarket channels to locate hard-to-find cards and sensors.

February 2026
Preparing a Speedtronic Card for Shipment

ESD and packaging guidelines that protect sensitive electronics during transit and storage.

PREVIEW
jeandorffconsultancy.com
Business Consultancy